钢铁企业混凝土枕道岔施工工艺研究与实施

Study and Application of Construction Technologies of Concrete Sleepers at Switchs in Steel Enterprises
下载PDF
导出
摘要 莱钢厂内封锁点更换混凝土枕道岔施工,分别采用了整体滑移和轨道吊车吊装两种不同的施工工艺,对不同方案进行研究与实施,探讨各自优缺点、适用范围及注意事项。 During the switch construction changing the concrete sleepers at closing-off spots in the plant of Laigang, the two kinds of construction processes of integrity sliding and hoisting by railway crane were taken, aiming at the different schemes, the research and construction were carried out, and their own advantages and disadvantages, application scopes and points for attention were explored.
机构地区 运输部
出处 《莱钢科技》 2011年第5期35-37,共3页 Laigang Science & Technology
关键词 封锁点 混凝土枕 道岔 滑移 吊装 closing off spits concrete sleeper switch sliding hoisting