摘要
中环线浦东段(上中路越江隧道—申江路)新建工程是上海市城市快速路系统网络建设的重要项目,是连接浦东、浦西的快速交通。工程范围内,全线共设置全互通立交4座,均为枢纽型全互通立交(济阳路、杨高路、罗山路和申江路立交)。通过对节点的分析,确定立交定位,指导工程方案设计。
Connecting Pudong area and Puxi area,the new-built project of the Middle Ring(Pudong Section)(Shangzhong Rd.Crossriver Tunnel-Shenjiang Rd.) is regarded as an important project,belonging to Shanghai urban expressways system network construction.The whole line sets up 4 hub-typed interchanges(Jiyang Rd.,Yanggao Rd.,Luoshan Rd.,and Shenjiang Rd.Interchanges) in the scope of the project.Through an analysis of nodes,the interchanges position is decided and the project plan design is guided.
出处
《中国市政工程》
2011年第5期34-36,45,共4页
China Municipal Engineering
关键词
中环线浦东段
枢纽型全互通立交
立交定位
立交功能
the Middle Ring (Pudong Section)
hub-typed interchange
interchange position
interchange function