The transmission project-Qinghai-Tibet 750 kV/±400 kV AC/DC interconnection project kicked off simultaneously in Golmud of Qinghai and Lhasa of Tibet in July 2010. This power transfer corridor, with a whole length of 1 774 km, is scheduled to be completed by the end of 2012, which will then realize the interconnection between Northwest (Qinghai) grid and Tibetan grid for the first time.
The transmission project--Qinghai-Tibet 750 kV/±400 kV AC/ DC interconnection project kicked off simultaneously in Golmud of Qinghai and Lhasa of Tibet in July 2010. This power transfer corridor, with a whole length of 1 774 km, is scheduled to be completed by the end of 2012, which will then realize the interconnection between Northwest (Qinghai) grid and Tibetan grid for the first time.