2x300 MW circulating fluidized-bed units passed trial operation
2x300 MW circulating fluidized-bed units passed trial operation
-
1Liu Chunsheng.2.5-MW domestic wind turbine passed tests[J].Electricity,2011,22(2):53-53.
-
2The first 410 t/h CFBC boiler passed appraisal andacceptance[J].Electricity,1998(2):47-47.
-
3Daya Bay Nuclear Power Plant passed the State's check and acceptance[J].Electricity,1997(1):50-50.
-
4A 500-kV substation passed upgrade acceptance for smart substation[J].Electricity,2011,22(1):49-49.
-
5MENG Yong-peng,PENG Fa-dong,YAN Li,CHEN Xiao-lin,CHENG Yong-hong,LIU Jing.Distributed On-line Monitoring System for Sheath Circulating Current of Cross-linked Power Cables[J].高电压技术,2009,35(3):533-538.
-
6Power Market of Zhejiang Power Grid Enters into Trial Operation[J].Electricity,2000(1):7-7.
-
7Yang Honghui.CATRC Yancheng Automobile Testing Ground Put into Trial Operation[J].中国橡胶,2014,30(16):4-5.
-
8Development of Design for Circulating Water Intake Structure in Thermal Power Plant[J].Electricity,1997(4):44-46.
-
9刘小飞.循环流化床锅炉运行浅析[J].中国电力教育,2010(A01):426-427.
-
10Synthetic Design and Research on Rotating-Rectifier Brushless Generator Passed Appraisal[J].Transactions of Nanjing University of Aeronautics and Astronautics,1997,14(1):18-18.