期刊文献+

CTCS-3级列控无线通信接口监测系统设计与实现

Design and Realization of CTCS-3 Wireless Communication Interface Monitoring System for Beijing-Shanghai High Speed Railway
下载PDF
导出
摘要 结合京沪高速铁路项目,对CTCS-3级列控无线通信接口监测系统的设计与实现进行了探讨,并给出了应用案例。 Based on the project of Beijing-Shanghai high speed railway,the design and realization of CTCS-3 train control wireless communication interface monitoring system is discussed,and an application example is presented.
作者 吴丽 孙斌
出处 《铁路通信信号工程技术》 2011年第5期16-19,共4页 Railway Signalling & Communication Engineering
关键词 列控 接口监测 设计 实现 train control interface monitoring design realization
  • 相关文献

参考文献3

  • 1Short M W, Barber B, Norrnaton A S, et al. Temperature prediction and eontrol during continuous resting[ A]. Inmnaking Conference Proceedings[ C]. Chicco: lrmmaking Di vision of the Iron & Steal Society, 1997.56,655 - 659.
  • 2Zoryk A, Reid P M. On-line liquid sted temperature control[A].76th AIME Steelmraking Conference[ C]. Dallas: Iron and Steel Society, 1993.31 - 40.
  • 3Robinson G. Quality and operaticnal benefits of continuous tundish temperature measurement at British steel teesside works[ A ]. Irmmaking Confi rence Proceedings [ C ]. Chicago:Ironmaking Division of the Iron & Steel Society, 1997.56,603-606.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部