伊川火电厂建设场地地质灾害危险性评估 被引量:1

Risk Evaluation of Geological Hazard of Land for Construction of a Thermal Power Plant in Yichuan County
下载PDF
导出
摘要 以伊川火电厂为例,调查分析了评估区的地质环境条件,针对该火电厂建设项目中的电厂工程、灰库工程、水库工程、铁路专用线工程进行了地质灾害危险性预测评估和综合分区评估,发现地质灾害的类型和地质灾害危险性明显受地质环境条件和工程建筑类型的影响。认为电厂工程、灰库工程的库中区和库尾区为地质灾害危险性小区,灰库工程的坝址区、水库工程和铁路专用线工程为地质灾害危险性中等区。 Based on the thermal power plant in Yichuan County as an example,the conditions of geological environment are investigated and analyzed.According to the power plant project,the ash cellar project,the reservoir project,special railway line project of the thermal power plant project,geological hazard estimate and comprehensive regional evaluation are conducted.It finds that the type of geological hazard and the risk of geological hazard are significantly affected by the conditions of geological environment and the types of constructions of the project.The power plant project,the central and tail of the ash cellar project are considered as the area of small geological hazard,and the dam site of the ash cellar project,the reservoir project and the railroad customizing line project are considered as areas of medium geological hazard.
作者 杨杰 贺为民
出处 《防灾科技学院学报》 2011年第3期78-82,共5页 Journal of Institute of Disaster Prevention
基金 郑州市创新型科技人才培育计划领军人才项目(10LJRC185) 教育部留学回国人员科研启动基金资助
关键词 地质灾害危险性评估 电厂工程 灰库工程 risk evaluation of geological hazard power plant project ash cellar project
  • 相关文献

参考文献6

二级参考文献11

共引文献13

同被引文献17

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部