摘要
城轨车辆制造完成后,应按国际电工标准IEC61133进行型式试验与例行试验。本文介绍了国外完成这些试验所具备的试验设施,包括维也纳的车辆环境试验中心,西门子公司的牵引系统试验中心及庞巴迪包岑工厂的车辆试验设施。
After completion of mass transit vehicle manufacture, it's essential routine test according to IEC 61133. This article introduces some foreign testing of those tests, including Vienna Vehicle Environmental Testing Center, Siemens System and Vehicle Testing Facilities in Bautzen Plant of Bombardier to carry out type test and facilities for implementation Testing Center for Traction
出处
《环境技术》
2011年第5期6-11,60,共7页
Environmental Technology
关键词
城轨车辆
试验设施
环境试验
系统试验
mass transit vehicle: testing facilities: environmental test: system test