摘要
以西安市三环路C02标段科技路桥现浇预应力连续箱梁工程为背景,对连续箱梁支架方案及施工技术进行了介绍,分别阐述了满堂支架基底处理、支架布置、搭设及拆除等关键工序操作要点,以期指导今后同类项目施工。
Taking cast-in-situ prestressed continuous box beam engineering of C02 scietific road bridge on Xi' an city Sanhuan road as the backgrounds, it introduces continuous box beam support scheme and construction technology, and respectively expounds bottom foundation treatment of full support, support layout, setting up and removal and other critical procedure operation points, with a view to guide future similar project construction.
出处
《山西建筑》
2011年第33期155-157,共3页
Shanxi Architecture
关键词
满堂支架
现浇预应力连续箱梁
施工方法
full support, cast-in-situ prestressed continuous box beam, construction methods