摘要
详细介绍了PDCA循环的含义,针对PDCA循环在建设项目造价控制过程中的应用进行了探讨,具体阐述了采用PDCA循环理念进行造价控制的步骤及相关注意事项,以期指导实践,保证建设项目顺利进行。
With a detailed introduction on the identification of PDCA cycle, it explores the application of PDCA cycle in construction project cost control, and describes cost control procedures with PDCA cycle concept and relevant attentions, with a view to guide practice and to guarantee the smooth progress of construction project.
出处
《山西建筑》
2011年第33期215-216,共2页
Shanxi Architecture