摘要 龙滩水电站6号机组顺利投产的同时,国产第一回A、B、C三相500 kV交联聚乙烯电缆也相应于2008年12月7日同时正式带电运行,这标志着国产500 kV电缆制造技术的重大突破,是中国电力史上的一个重要里程碑。实现了依托大型工程,引进、消化、吸收国外先进技术,推动我国重大技术装备创新的战略目标,填补了国内空白,促进了我国电力事业的发展,为其它水电站及输变电线路设计和建设提供了宝贵的经验和可靠的技术保证。具有重大实用价值。 Along with Unit 6 in Longtan Hydropower Station was commissioned,the domestic first loop crosslinked polyethylene cable with A,B,C three phases came into charged operation on December 7,2008.This indicates a major breakthrough in 500kV localization cable manufacturing technology.It is a milestone in the history of China electric power and realizes the strategic objective of importing advanced technology to promote technical updating for important equipment.It provides valuable experience for other hydropower stations and design and construction of power transmission projects.
出处 《水电站机电技术》 2011年第5期39-42,96,共4页 Mechanical & Electrical Technique of Hydropower Station
关键词 500 KV XLPE 绝缘电缆 国产化 应用 500kV XLPE insulated cable localization application
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部