期刊文献+

灰铸铁补焊技术的探讨

Discussion on the repair welding technology of grey cast iron
下载PDF
导出
摘要 国电介绍空预器B减速机箱体(灰铸铁)运行中发现裂纹,采用的挖补修复技术。 Anshun electric power plant, phase I and II (4 ~ 300MW), with a total installed capacity of 1200MW, have been put into production from 1998 to 2001. It is the first plant with a total installed capacity over 1000 MW in Guizhou. In recent years,we have solved many operating deficiencies of generator urfits. This paper presents the crack repair welding technology for B housing of reducer (grey east iron)of 2# boilers' air preheater to learning together with the exchange.
作者 邓代兴
出处 《贵州电力技术》 2011年第1期59-60,共2页 Guizhou Electric Power Technology
关键词 灰口铸铁 补焊 址延孔 小规范焊接参数 grey cast iron repair welding add extension hole small standard welding parameter
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部