国电介绍空预器B减速机箱体(灰铸铁)运行中发现裂纹,采用的挖补修复技术。
Anshun electric power plant, phase I and II (4 ~ 300MW), with a total installed capacity of 1200MW, have been put into production from 1998 to 2001. It is the first plant with a total installed capacity over 1000 MW in Guizhou. In recent years,we have solved many operating deficiencies of generator urfits. This paper presents the crack repair welding technology for B housing of reducer (grey east iron)of 2# boilers' air preheater to learning together with the exchange.
出处
《贵州电力技术》
2011年第1期59-60,共2页
Guizhou Electric Power Technology
关键词
灰口铸铁
补焊
址延孔
小规范焊接参数
grey cast iron
repair welding
add extension hole
small standard welding parameter