摘要
通过贵州大田河电厂黑启动方案的理论、保护调整依据和实施过程,验证了大田河电厂黑启动方案的可行性。
In the face of unpredictable natural disasters, rapid restoration is particularly important in large power grid when there is an accident. This paper introduced the theoretical foundation and implementation process of black - start test carried out in Guizhou Datianhe hydro - plant, and verified the feasibility of the plan.
出处
《贵州电力技术》
2011年第3期52-55,共4页
Guizhou Electric Power Technology
关键词
零起升压
黑启动
大田河电厂
stepping up from zero
black - start
Datianhe hydro - plant