高落差水闸消能工优化设计 被引量:11

Optimization Design of Sluice Energy Dissipator with High Head
下载PDF
导出
摘要 以辽宁省高落差水闸——清河闸为例,水闸消能防冲设计应根据闸基地质、水力条件、闸门控制运用方式和工程投资等因素进行综合分析确定,比较了单级消力池、多级消力池、单级跌水不同方案消能工的设计、工程投资和消能效率等,讨论并推导了二级消力池消能计算的理论和方法。结果表明,优选单级跌水方案较经济合理。 The energy dissipation and erosion control design of sluice needs comprehensive analysis of geology condition of sluice foundation, hydraulic condition, gate operation and project investment. Taking high head gate in Liaoning Province for an example, energy dissipator design, project investment and efficiency of energy dissipation are compared for single stilling basin, multi-stilling basin, and single hydraulic drop. And then the calculation method of energy dissipation for two-stage stilling basin is discussed. The results show that the single hydraulic drop scheme is much more eco- nomic and reasonable.
出处 《水电能源科学》 北大核心 2011年第11期126-128,215,共4页 Water Resources and Power
关键词 高落差 水闸 消力池 消能防冲 high heads sluices stilling basins energy dissipation and erosion control
  • 相关文献

参考文献10

二级参考文献20

  • 1钟登华,胡程顺,张静.高土石坝施工计算机一体化仿真[J].天津大学学报(自然科学与工程技术版),2004,37(10):872-877. 被引量:17
  • 2吴之明.网络进度-费用的联合管理[J].系统工程理论与实践,1995,15(6):9-17. 被引量:14
  • 3刘全,杨学红,范五一,杨栋,曹林香.基于赋时Petri网大坝混凝土施工过程建模与实现[J].水电能源科学,2005,23(4):12-14. 被引量:8
  • 4戴建国.活动网络资源均衡问题及其遗传算法[J].系统工程学报,1996,11(2):29-36. 被引量:7
  • 5Hijazi A M, AbouRizk S M, Halpin D W. Modeling and simulating learning development in construction [ J ]. Constr. Eng. Manage, 1992, 118(4) : 685-700.
  • 6Lu Ming. Simplified discrete-event simulation approach for construction simulation[ J ]. Journal of Construction Engineering and Management, 2003, 129(5): 537-546.
  • 7Balqies S. Applied System Simulation: a Review Study [ J ]. Information Sciences, 2000, 124 : 173-192.
  • 8Lee K, Fishwick P A. OOPM/RT: a muhimodeling methodology for real-time simulation[J]. ACM Transactions on Modeling and Computer Simulation, 1999, 9(2): 141-170.
  • 9Sahil Malik. Pro ADO. NET 2. 0[ M]. New York: Apress, 2005, 470- 500.
  • 10Zhong D H, Li J R, Zhu H R, et al. Geographic information system-based visual simulation methodology and its application in concrete dam construction processes [ J ]. Journal of Construction Engineering and Management, ASCE, 2004, 130(5) : 742-750.

共引文献31

同被引文献66

引证文献11

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部