摘要
航电犍为枢纽工程是岷江乐山~宜宾河段航电六级规划开发方案的第3级。通过对五通桥、高场水文站洪水计算及上游梯级、库区防洪堤对设计洪水的影响分析,确定航电犍为枢纽的设计洪水成果。
Qianwei Navigation and Hydropower Complex Project is the third cascade of the development plan with six cascades between Min river reach of Leshan-Yibing. Design flood outcomes of Qianwei Navigation and Hydropower Complex is to be defined based on the calculation of Wutongqiao and Gaochang Hydrologic Stations and the influence analysis of upstream cascade and flood bank against design flood.
出处
《红水河》
2011年第5期6-9,18,共5页
Hongshui River
关键词
设计洪水
历史洪水调查
航电犍为枢纽工程
design flood
historical flood investigation
Qianwei Navigation and Hydropower Complex Project