摘要
土地是不可再生资源。在城镇建设用地日益紧张的状况下,变电站建设出现了选址难、征地难、拆迁难和补偿谈判难等问题,严重影响了电网建设速度。而同时,市政建设加快,各种立交桥拔地而起。本文以陕西某变电站为例,介绍了城市立交桥下变电站的建筑设计研究,是国内第一座位于立交桥下的变电站,该项目获陕西省科技进步奖。
Land is not renewable resource.With the place on the town construction decreasing,the problems on location chosen,location purchasing,dismantling and moving and referring compensate appears to influence the net construction speed.At the same time,municipal services construction quickens,various interchange rises straight from the ground.This text gives some an example of substation in Shaanxi to introduce the design and study on the substation under interchange in the city.It is the first substation under bridge in our country.
出处
《电力勘测设计》
2011年第5期71-75,共5页
Electric Power Survey & Design
关键词
立交桥
变电站
设计研究
interchange
substation
design
study.