摘要
本文以广州文冲船厂有限责任公司建造3500m3/h绞吸式挖泥船"新海豚"号的疏浚集成监视与控制系统为例,详细地介绍绞吸式挖泥船控制系统,指出了需要进一步研究和改进的问题。
This paper presents the integrated supervisory and control system for dredgers with the example of 3 500 m3 cutter suction dredge "Xin Hai Tun" built by Guangzhou Wenchong Shipyard and indicates some items to be further researched and improved.
出处
《广东造船》
2011年第5期58-61,共4页
Guangdong shipbuilding