摘要
以黄河乌金峡水电站为例,探讨了贯流式水轮发电机组运行中的一些影响因素及应对措施。
Take the Yellow River Wujin Gorge Hydropower Station as example to discuss some influence factors and countermeasures during the operation of tubular turbine.
出处
《中国水能及电气化》
2011年第11期64-67,共4页
China Water Power & Electrification
关键词
水电站
贯流式水轮机
运行维护
hydropower
tubular turbine
operating maintenance