期刊文献+

基于NSGA-Ⅱ的工程项目工期—成本—质量均衡优化 被引量:1

原文传递
导出
摘要 工程项目工期-成本-质量多目标均衡优化是近年来工程项目管理领域的研究热点问题。针对这一问题,分析了工期与质量之间的关系,提出了工期与质量的s-型曲线,构建了工期一成本一质量的均衡优化模型,通过经典多目标测试函数对NSGA-II求解多目标优化问题的可行性和有效性进行了测试。在此基础上,利用该算法进行了工程项目工期-成本-质量的多目标均衡优化,得到了一组Pareto最优解,为项目管理者的决策提供了依据。
作者 张连营 岳岩
出处 《项目管理技术》 2011年第11期44-48,共5页 Project Management Technology
基金 国家自然科学基金项目资助(70871088)
  • 相关文献

参考文献9

  • 1Robert McKim, Tarek Hegazy, Mohamed Attalla. Project performance control in reconstruction projects [ J]. Journal of Construction Engineering and Management, 2000, 126(2):137-141.
  • 2王健,刘尔烈,骆刚.工程项目管理中工期—成本—质量综合均衡优化[J].系统工程学报,2004,19(2):148-153. 被引量:163
  • 3Anjana D Nandasana, Ajay Kumar Ray, Santosh K Gupta. Applications of the non - dominated sorting genetic algorithm (NSGA) in chemical reaction engineering [ J]. International Journal of Chemical Reactor Engineering, 2003 (1): 1018-1 035.
  • 4Deb K, Pratap A, Agarwal S, et al. A fast and elitist muhiobjective genetic algorithm: NSGA-II [ J ]. IEEE Transactions on Evolutionary Computation, 2002, 6 (2) : 182-197.
  • 5陈小庆,侯中喜,郭良民,罗文彩.基于NSGA-II的改进多目标遗传算法[J].计算机应用,2006,26(10):2453-2456. 被引量:43
  • 6Reza Ghodsi, Mohammad Reza Skandari, Morteza Allahver- diloo, et al. A new practical model to trade - off time, cost, and quality of a project [ J]. Australian Journal of Basic and Applied Sciences, 2009, 3 (4) : 3 741-3 756.
  • 7Deb K, Goyal M. A combined genetic adaptive search (GeneAS) for engineering design [ J]. Computer Science and Informatics, 1996, 26 (4): 30-45.
  • 8Kittler J, Hatef M, Duin R P W, et al. On combining classifiers [J]. IEEE Transactions on Pattern Analysis and Machine Intelligence, 1998, 20 (3): 226-239.
  • 9David A Van Veldhuizen, Gary B Lamont. Muhiobjective evolutionary algorithm test suites [ C ] ,//Barrett Bryant, Gary B Lamont, Hisham Haddad. Proceedings of the 1999 ACM Symposium on Applied Computing, San Antonio: ACM, 1999.

二级参考文献15

  • 1McKim R, Hegazy T, Attalla M. Project performance control in reconstruction projects[J]. Journal of Construction Engineering and Management, 2000, 126 (2): 137-141.
  • 2Rwelamila P D, et al. Total systems intervention: An integrated approach to time, cost and quality mawgement[J]. Construction Management and Economics, 1995, 13: 235-241.
  • 3Babu A J G, Suresh N. Project management with time, cost, and quality considerations[ J]. European Journal of Operational Research, 1996, 88 (2): 320-327.
  • 4Do Ba Khang, Yin Mon Myint. Time, cost and quality trade-off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4): 249-256.
  • 5Shih-Wen Hsiao. Fuzzy logic based decision models for product design[J]. International Journal of Industrial Ergonomics, 1998,21: 103-116.
  • 6DEB K,PRATAP A,AGRAWAL S,et al.A Fast and Elitist Multi-Objective Genetic Algorithm:NSGA-Ⅱ[R].KanGAL Report No.200001.India,2000.
  • 7ZITZLER E.Evolutionary Algorithms for Multi-objective Optimization:Methods and Applications[D].A dissertation submitted to the Swiss Federal Institute of Technology Zurich for the degree of Doctor of Technical Sciences.1999.
  • 8SCHAFFER JD.Multiple objective optimization with vector evaluated genetic algorithms[A].In Proceedings of an International Conference on Genetic Algorithms and Their Applications[C].Pittsburgh,PA.,1995.
  • 9ZITZLER E,DEB K,THIELE L.Comparison of Multi-objective Evolutionary Algorithms:Empirical Results[J].Evolutionary Computation,2000,8(2):173-195.
  • 10HAJELA P,LIN C-Y.Genetic Search Strategies in Multi-criterion Optimal Design[J].Optimization,1992,(4):99-107.

共引文献204

同被引文献9

引证文献1

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部