3Houston D X, Maekulak G T, Collofello J S. Stochastic simulation of risk factor potential effects for software development risk management [ J]. Journal of Systems and Soflware, 2001, 59 (3): 247-257.
二级参考文献9
1Tiong R L K.Comparative study of BOT projects[J].Journal of Management in Engineering,1990,6 (1):107-120.
2Qiao Lin,Wang shouqing,Tiong Robert L K,et al.Critical success factors for tendering BOT infrastructure projects in China[J].Journal of Structured Finance,2002,8 (1):40-52.
3K T Yeoa,Robert L K Tiongh.Positive management of differences for risk reduction in BOT projects[J].International Journal of Project Management,2000,18(4):257-265.
4Shen L Y,Wu Y Z.Risk concession model for build/operate/transfer contract projects[J].Journal of Construction Engineering and Management,2005,131 (2):211-220.
5Molenaar K R,Bogus S M,Priestley J M.Design/build for water/wastewater facilities:state of the industry survey and three case studies[J].Journal of Management in Engineering,2004,20 (1):16-24.
6Shen Junxin,Wang Songjiang.The decision-making model of TOT concession period based on Colored Stochastic Petri Net[C].Chengdu:ICCET,2010:647-650.
7Shen Junxin,Wang Songjiang.The decision-making model of TOT concession period based on fuzzy stochastic petri net[C].Wuhan:MASS,2010:1-4.