期刊文献+

关于整体式梁板结构拆模期限的探讨

下载PDF
导出
摘要 本文从砼受弯构件强度计算角度出发,探讨整体式结构提前拆模的可能性,提出受弯构件可以降低一个强度等级拆模。适度放宽拆模期限是可以保证结构安全并有利于建筑业的发展。
作者 盘瑞符
出处 《陕西建筑》 2011年第9期28-31,共4页 Shaanxi Architecture
  • 相关文献

参考文献4

二级参考文献9

  • 1[1]P· K· Mehta.Durabiltiy— — Critical lssues for the Future.Concrete International, 1997, 7
  • 2[2]P· K· Mehta.Concrete Technology at the Crossroads— — Problems and Opportunities.ACI SP 144-1, 1994
  • 3[3]R· Miller,B· Shahrooz,et al..Testing of High Performance Concrete Single-Span Box Girder.TRANSPORTATION RESEARCH REC ORD 1624
  • 4[4]Rupert Springenschmid.Development of the Cracking Frame and the Temperature-Stress Testing Machine.Thermal Cracking in concrete at Early Ages.E& FN SPON.1995
  • 5[5]Final Report by RILEM TC 116-PCD. Concrete Durability— An Approach towards performance Testing.Materials and Structures.April 1999
  • 6[6]Geert De Schutter.Hydration and temperature development of concrete made with blast-furnace slag cement.Cement and Concrete research.29(1999)
  • 7[7]P· K· Mehta.Advancements in Concrete Technology.Concrete International.June 1999
  • 8[8]P· K· Mehta.Role of Pozzolanic and Cementious material in Sustainable Development of the Concrete Industry.ACI SP 178-1
  • 9[9]A· Sarja.Durability Design of Concrete Structures— Committee Report 130-CSL.Materials and Structures.Jan-Feb 2000

共引文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部