摘要
针对某厂房工程出现的粉喷桩质量事故,根据复合地基载荷试验、单桩载荷试验及抽芯等检测情况,分析事故成因,介绍了事故桩的处理方案,就粉喷桩设计、施工及检测进行探讨。
Pointing against a Cement Injection Pile accident in a factory building, according to composite foundation of loading test, Single-pile loading test and core pulling test, analyzed the reason of the accident, described the accident pile of treatment, also discussion on the Cement Injection Pile design, construction and testing issues.
出处
《工程质量》
2011年第11期55-56,共2页
Construction Quality
关键词
粉喷桩
质量事故
检测
cement injection pile
construction quality accident
test