8El-Rayes K,Kandil A.Time-cost-quality trade-off analysis for highway construction[J].Journal of Construction Engineering and Management, 2005,131 ( 4 ) : 477-486.
9Konak A,Coit D W,Smith A E.Multi-objective optimization using genetic algorithms:A tutorial[J].Reliability Engineering and System Safety, 2006,91 : 992-1007.
10Kennedy J,Eberhart R.Particle swarm optimization[C]//Proc IEEE Int Conf on Neural Networks, Perth ,1995 :1942-1948.