摘要
白云金矿接替资源勘查项目共布设22条勘查线,实施49个钻孔,控制网度160米×160米,金资源量估算严格按照《岩金矿地址勘查规范》要求执行,共计探获333级别金金属量15777千克。结合外围相邻金矿区,无疑已经构成了一个特大型金矿床。白云金矿接替资源勘查为保障辽宁基础工业冶炼加工原料供求,推动辽宁老工业基地振兴,做出了重大的历史性贡献。
Baiyun Gold Mine replacement resources exploration project has placed 22 exploration line, already drilled 49 holes, placed control network of 160 meters × 160 meters. According to Rock Gold Address Exploration Standard, the golden volume estimation was implemented strictly, totally obtained 15777 kg of 333 level golden. Combined with outside next to gold area, an extra large gold mineral deposit has been formed. Replacement resources exploration in Baiyun Gold Mine made a significant historic contribution in supplying refining and processing raw materials to Liaoning basic industry and promoting the revitalization of old industrial base.
出处
《科技成果管理与研究》
2011年第11期69-71,共3页
Management And Research On Scientific & Technological Achievements
关键词
金矿
金属量
特大型金矿
gold mine
metal volume
extra large gold mine