双壁钢吊箱围堰制造并下水工艺探讨 被引量:5

Process Discussion of the Manufacture and Launching of Double-wall Steel Suspension Cofferdams
下载PDF
导出
摘要 深水环境下桥梁基础的施工有多种形式,最主要的是钢围堰法。以武汉二七长江大桥的施工为依据,详细介绍了双壁钢吊箱围堰的制造工艺以及制造完成后下水浮运的具体方案。围堰制造采用分块制造,依次组拼的原则,下料、拼装、焊接每一步都经过严格检查验收,确保工程质量。钢吊箱围堰制造及下水工艺复杂,精度要求高,难度大。 In deepwater,the construction of bridge foundation has various methods and the steel cofferdams is the most important.On the basis of Wuhan Erqi Yangtze River Bridge,the process of the manufacture of the double-wall steel suspension cofferdams and the specific discussion of launching after manufacture were introduced in detail.Based on block manufacture,cofferdams manufacture was followed by assembly.To ensuring project quality,cutting,splicing and welding were inspected strictly.The process of manufacture and launching was complicated and highly required accuracy.
作者 陈国刚
出处 《重庆交通大学学报(自然科学版)》 CAS 北大核心 2011年第5期925-930,1026,共7页 Journal of Chongqing Jiaotong University(Natural Science)
关键词 钢吊箱 围堰 制造 下水 工艺 steel suspension cofferdam manufacture launching process
  • 相关文献

参考文献6

二级参考文献8

共引文献166

同被引文献48

引证文献5

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部