MES环境下作业车间多级动态调度方法研究 被引量:7

Study on a multi-level job-shop dynamic scheduling method under MES environment
下载PDF
导出
摘要 作业车间存在着许多不确定信息干扰生产,为有效解决制造执行系统环境下作业车间的动态调度问题,设计了一种基于实时数据采集的多级作业车间动态调度方法。在静态调度基础上,根据车间生产中实际情况,考虑了紧急插单、加工延时、机器停工等影响排产的扰动因素,建立作业车间动态调度模型,设计了缓冲吸收、调度修复及完全重调度相融合的调度方法。以交货期为目标,通过算例演算,实现了对动态扰动因素的满意处理,验证了方法的有效性。 There is much uncertain information interfering with the production in the job shop,in order to effectively solve the dynamic scheduling problem in job shop under MES environment,a multi-level job shop dynamic scheduling method is designed based on real-time data acquisition.According to the actual situation in production of the job-shop,considering disturbance factors that may influence production scheduling such as order inserting in urgent,prolong of machining and shut down of the machine,etc.a job shop dynamic scheduling model is established,and a hybrid method integrating snubber,scheduling repairing and completed rescheduling is designed.To delivery the ordered in time as the goal,through an example calculation satisfied processing of dynamic disturbance factors is realized,which verify the validity of the method.
出处 《机械设计与制造》 北大核心 2011年第11期240-242,共3页 Machinery Design & Manufacture
基金 国家自然科学基金项目(70971118) 浙江省科技厅计划项目(2009C31025 2009C11164)
关键词 制造执行系统 车间调度 扰动影响 多级调度 Manufacturing execution systems Shop scheduling Disturbance influence Multi-level scheduling
  • 相关文献

参考文献7

  • 1Djamila Ouelhadj,Sanja Petrovic.A survey of dynamic scheduling in manufacturing systems [J].Intelligent systems design and applications 2009,12(8):417-431.
  • 2B.Saenz de Ugartea,A.Artibab and R.Pellerina.Manufacturing execution system a literature review [J].Production Planning & Control,2009,10 ( 11 ):525-539.
  • 3Cowling PL,Johansson,M.Using real-time information for effective dynamic scheduling[ J ].European Journal of Operational Research, 2002,139 (2) : 230-244.
  • 4潘全科,王文宏,朱剑英,赵保华.基于粒子群优化和变邻域搜索的混合调度算法[J].计算机集成制造系统,2007,13(2):323-328. 被引量:43
  • 5K Kouiss, H Pierreval, N Mebarki, Using multi-agent architecture in FMS for dynamic scheduling [J].Joumal of Intelligent Manufacturing, 1997,8 ( 1 ):41-47.
  • 6柴永生,孙树栋,余建军,吴秀丽.基于免疫遗传算法的车间动态调度[J].机械工程学报,2005,41(10):23-27. 被引量:21
  • 7吴秀丽.柔性作业车间动态调度问题研究[J].系统仿真学报,2008,20(14):3828-3832. 被引量:41

二级参考文献23

  • 1潘全科,朱剑英.基于进化算法和模拟退火算法的混合调度算法[J].机械工程学报,2005,41(6):224-227. 被引量:21
  • 2柳毅,马慧民,叶春明.免疫遗传算法在柔性Job-shop调度问题中的应用[J].上海理工大学学报,2005,27(5):393-396. 被引量:7
  • 3潘全科,朱剑英.解决无等待流水线调度问题的变邻域搜索算法[J].中国机械工程,2006,17(16):1741-1743. 被引量:8
  • 4CHU C,PROTH J M,WANG C.Improving Job Shop schedules through critical pairwise exchanges[J].International Journal of Production Research,1998,36(3):683-694.
  • 5NOWICKI E,SMUTNICKI C.A fast taboo search algorithm for the Job Shop scheduling[J].Management Science,1996,42(6):797-813.
  • 6SAKAWA M,MORI T.An efficient genetic algorithm for Job Shop scheduling with fuzzy processing and fuzzy duedate[J].Computers & Industrial Engineering,1999,36(2):325-341.
  • 7LAARHOVEN P V,AARTS E,LENSTRA J K.Job Shop scheduling by simulated annealing[J].Operations Research,1992,40(1):113-125.
  • 8CORCE F D,TADEI R,VOLTA G.A genetic algorithm for the Job Shop problem[J].Computers and Operations Research,1995,22(1):15-24.
  • 9AMICO M D,TRUBIAN M.Applying tabu search to the Job Shop scheduling problems[J].Annual Operations Research,1993,40:231-252.
  • 10WANG L,ZHENG D Z.An effective optimization strategy for Job Shop scheduling problems[J].Computers and Operations Research,2001,28(6):585-596.

共引文献102

同被引文献32

  • 1潘全科,朱剑英.作业车间动态调度研究[J].南京航空航天大学学报,2005,37(2):262-268. 被引量:29
  • 2连立峰,左兵群.冷轧薄板生产车间作业计划及调度系统的研究与实现[J].冶金自动化,2006,30(5):6-10. 被引量:3
  • 3Bruker P,Schlie R.Job shop scheduling with muhi purpose machines [ J ]. Computing, 1990,45 ( 4 ) : 369-375.
  • 4Liu Yong-xian,Liu Xiao-tian.Research on job-shop scheduling optimization method with limited resources [J].International Journal of Advanced Manufacturing Technology, 2008,38(3 ) : 386-392.
  • 5Mirsanei, H.S.A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times [J].Journal of Intelligent Manufacturing, 2011,22(6) : 965-978.
  • 6Moslehi, Ghasem.A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search [ J ].International Journal of Production Economics, 2011,129( 1 ) :14-22.
  • 7Nagesh Sukhiand,Ward Nice Intelli- gent second-generation MES solutions for 300mm fabsSolid State Technology200006).
  • 8刘晓冰,黄学文.制造执行系统(MES)的研完和应用[D].大连理工大学,2003.
  • 9吴秀丽,李苏剑,杜彦华.柔性作业车间多品种小批量调度算法研究[J].中国机械工程,2010,21(4):424-429. 被引量:19
  • 10赵斌,张红雨.RFID技术的应用及发展[J].电子设计工程,2010,18(10):123-126. 被引量:75

引证文献7

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部