摘要
柏叶口水库大坝施工中,大坝主体填筑共检测样品23个,其中:2A垫层料检测样品8个,2B特殊垫层料检测样品1个,3A过渡料检测样品4个,3B主堆石检测样品6个,3C次堆石检测样品4个,质量抽检均已达到设计要求。
During the construction period of placing dam of Baiyekou Reservoir,23 samples from placed dam body had been checked,among them,8 samples from 2A bedding,1 sample from 2B special bedding,4 samples from 3A intermediate layer,6 samples from 3B main rockfill area,and 4 samples from 3C downstream rockfill area.Through sampling inspection,all of these samples have met the design demand.
出处
《山西水利科技》
2011年第4期16-19,共4页
Shanxi Hydrotechnics