摘要
结合坪湖矿井东、西两翼风量实际分配情况,对矿井井下风量进行重新调配,合理安排矿井采掘生产活动,缓解矿井生产接替紧张的压力。
Combined with the actual air flow allocation in east and west wings of Pinghu Colliery,underground air flow in mines has been reallocated,which makes mining production reasonable and relieves the pressure of mine production replacement.
出处
《江西煤炭科技》
2011年第4期4-6,共3页
Jiangxi Coal Science & Technology
关键词
通风系统
东风西调
生产接替
ventilation system
air flow allocation
production replacement