摘要
文章通过对响水水库加固施工的交通条件、气候条件、资源条件的分析,确定主体施工方法和施工布置,合理安排施工计划,有效地缩短了施工工期,保证工程如期完成。
Through the analysis of the traffic,weather and resources conditions for the reinforcement construction of Xiangshui reservoir,the paper determines the main construction method,arrangement and plan,which could shorten effectively the construction period and ensure timely the projects completion.
出处
《东北水利水电》
2011年第11期1-3,71,共3页
Water Resources & Hydropower of Northeast China
关键词
除险加固
施工组织设计
响水水库
strengthening and repairing risky reservoir
construction planning
Xiangshui reservoir