摘要 东北地区河流均存在不同程度冰情,河流封江期和开江期冰情对工程安全施工存在一定风险。文章根据东北地区莲花水电站、尼尔基水利枢纽工程施工期渡凌实践,通过冰情预报方案编制、工程渡凌措施和非工程渡凌措施等方面的论述,对施工期冰情预报方案编制和渡凌措施的技术问题进行了总结,提出了比较合理的建议。 The rivers have the ice regimes with different degree in northeast China,the ice regimes in freezing or thawing period have some risks for the project safety.Based on the ice controlling practices during the construction period of Lianhua hydropower station and Nierji hydro-junction,the paper discusses the forecast scheme compilation and the engineering and non-engineering controlling measures,summarizes the technology questions for the above-mentioned things and puts forward some reasonable suggestions.
出处 《东北水利水电》 2011年第11期28-29,71,共2页 Water Resources & Hydropower of Northeast China
关键词 水利水电工程 施工期 冰情预报 渡凌措施 东北地区 hydropower project construction period ice regime forecast ice controlling measure northeast China
  • 相关文献

参考文献3

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部