摘要
以某特大桥工程为例,对高墩滑模施工技术进行了探讨,从滑升模板构造、组装方法、混凝土浇筑、质量检验等方面具体介绍了滑模现浇混凝土施工工艺及操作要点,以期指导实践。
Taking the extra-large bridge engineering as the example, it explores the construction technology of high pier sliding model, expounds cast-in-situ sliding model concrete construction technology and operation points from aspects of sliding formwork structure, assembling methods, concrete grouting and quality check etc, so as to guide practice.
出处
《山西建筑》
2011年第34期103-104,共2页
Shanxi Architecture
关键词
高墩
滑升模板
现浇混凝土
施工方法
high pier, sliding model, cast-in-situ concrete, construction method