阐述了项目进度管理的重要性,从建设单位、设计单位、施工单位、监理单位、材料设备供应商、政府主管部门及社会和自然条件的角度分析了装饰工程导致进度滞后的原因,并提出了应对措施,从而在保证工程质量和安全的前提下使项目周期更短、成本更低。
With a description on the significance of project schedule management, from aspects of construction unit, design unit, execution unit, supervision unit, material and facility suppliers, government administration department, and social and natural conditions, it analyzes causes of decorative engineering leading to schedule lag, and proposes countermeasures, so as to shorten project duration and reduce cost at the premise of guaranteeing engineering quality and security.