摘要 积石峡水电站导流洞及中孔泄洪洞交叉段设计体形复杂,且顶拱上方有一3~10 cm厚的软弱夹层穿过,围岩整体稳定性差,安全问题突出。为确保交叉段顺利贯通及施工安全,拟定了5种开挖和支护方案,采用数值仿真分析系统分析比较了不同开挖和支护方案下施工期围岩和支护的稳定性,确定了交叉段的开挖方式和支护技术措施,经实际应用,效果良好。 The shape design of the cross section of diversion tunnel and middle spillway tunnel in Jishixia Hydropower Station project is complex, and there is a week intercalated layer with a thickness of 3-10 m in the crown area, the stabilities of surrounding rock masses are poor. For guaranteeing the safe construction, five excavation and support programs arc developed and the stabilities of surrounding rocks and support under different program are simulated numerically and compared to determine the final construction program. The actual excavation shows that the program is feasible.
出处 《水力发电》 北大核心 2011年第11期21-24,共4页 Water Power
关键词 交叉段 开挖 支护 稳定性 数值仿真 积石峡水电站 cross section excavation support stability numerical simulation Jishixia Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部