结合积石峡水电站特点,综合可靠性、经济性、灵敏度分析以及连通性概率等几个不同方面,对积石峡水电站主接线的三个方案做了全面的比较,为该电站主接线选择提供定量依据,同时可为其他工程参考。
Three programs of main electrical connection for Jishixia Hydropower Station are compared from the reliability, economy and sensitivity analyses and the probability calculation of connectivity. These quantitative analyses provide basis for the selection of main electrical connection, and can be as references for other projects.