积石峡水电站导流洞交叉段平顶扭面拱衬砌模板及支撑设计

Concrete Lining Formwork and Support Design for the Flat-twisted Crown of Crossing Section in the Diversion Tunnel of Jishixia Hydropower Station
下载PDF
导出
摘要 积石峡水电站导流洞与中孔泄洪洞交叉段体形复杂、施工场地狭窄、施工质量要求高,其顶拱形式为两个城门形顶拱相切形成的平顶扭面拱。根据这些特点和施工特殊性,对交叉段模板及支撑系统进行了设计,并采用底部钢管支柱支撑桁架梁平台,平台上搭设碗扣式脚手架支撑顶部模板的施工方案,成功克服了施工中的各种问题,及时有效地完成了衬砌施工。 The cross section of diversion and middle spillway tunnels in Jishixia Hydropower Station has a complex shape and the crown is a flat-twisted arch as the tangeney of two gate-shaped crowns. Because of the narrow construction site and high construction quality requirements, the formwork and support system for the concrete lining of cross section are specially designed as using steel pillars in bottom to support truss beam platform and setting cuploek scaffold on the platform to support crown formwork. The problems in construction are successfully solved and the lining construction is timely completed.
出处 《水力发电》 北大核心 2011年第11期67-69,共3页 Water Power
关键词 导流洞 中孔泄洪洞 平顶扭面拱 混凝土衬砌 模板设计 支撑结构 积石峡水电站 diversion tunnel middle spillway tunnel fiat-twisted crown concrete lining formwork design support structure Jishixia Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部