摘要
西安市地铁二号线一期工程会展中心至韦曲南段D2TJSG-23标段,主要工作为三爻站—凤栖原站区间隧道,隧道采用浅埋暗挖法施工。文章针对施工用电方案、施工机械设备、配电系统布置、电力负荷计算、防雷装置、外电线路及电气设备防护、安全用电责任制和组织措施、电气防火措施及临电检查等进行论述。
The No 2 Subway Line in Xi'an of the southern of Convention and Exhibition Center to Wei Qu D2TJSG-23 sections, mainly the work of three of the original Yao Station to Station Fengqi tunnel, the tunnel excavation method use shallow. The article is about the eonstruction of electricity scheme, construction machinery and equipment, power distribution system layout, load calculation, lightning protection devices, wiring and electrical equipment protection foreign, security, accountability and organizational measures electricity, eleetrical fire prevention measures, and temporary electrical inspection, etc.
出处
《机械管理开发》
2011年第6期61-64,66,共5页
Mechanical Management and Development
关键词
施工用电
电气设备防护
用电组织措施
临电检查
construction of electricity
protection of electrical equipment
organizational measures electricity
check in advance