地铁区间临时用电施工组织设计 被引量:2

The Design of Temporary Power of Part of the Subway Construction
下载PDF
导出
摘要 西安市地铁二号线一期工程会展中心至韦曲南段D2TJSG-23标段,主要工作为三爻站—凤栖原站区间隧道,隧道采用浅埋暗挖法施工。文章针对施工用电方案、施工机械设备、配电系统布置、电力负荷计算、防雷装置、外电线路及电气设备防护、安全用电责任制和组织措施、电气防火措施及临电检查等进行论述。 The No 2 Subway Line in Xi'an of the southern of Convention and Exhibition Center to Wei Qu D2TJSG-23 sections, mainly the work of three of the original Yao Station to Station Fengqi tunnel, the tunnel excavation method use shallow. The article is about the eonstruction of electricity scheme, construction machinery and equipment, power distribution system layout, load calculation, lightning protection devices, wiring and electrical equipment protection foreign, security, accountability and organizational measures electricity, eleetrical fire prevention measures, and temporary electrical inspection, etc.
作者 王希亮
出处 《机械管理开发》 2011年第6期61-64,66,共5页 Mechanical Management and Development
关键词 施工用电 电气设备防护 用电组织措施 临电检查 construction of electricity protection of electrical equipment organizational measures electricity check in advance
  • 相关文献

参考文献2

二级参考文献2

共引文献5

同被引文献8

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部