摘要 近年来,国内大型煤炭企业纷纷选择向下游延伸产业链,现已形成了煤焦化、煤电化、煤油化3条产业路径;但是,煤炭企业产业链延伸风险管理的现状不容乐观。煤炭企业产业链风险管理,实质是针对多项目的风险管理,对风险因素的发生呈现灾害链式效应的特征。对煤炭企业产业链延伸风险管理应从多项目管理角度进行阶段划分,按照项目组合、项目集和单一项目分层进行管理。项目组合风险管理可依循基本管理模式进行。在此基础上,针对煤炭企业在产业链延伸过程当中可能遇到的风险,提出了一般性对策,以有效地预防、识别、降低和规避煤炭产业链延伸的经营战略风险。 Domestic coal enterprises had choice to downstream extensions industry chain, three industrial path had been formed, including the coal coking,coal-turning-electricity and kerosenization. However, the current situation of the risk management in coal enterprise industry chain extension is not optimistic. According to the theory of multi-project risk management, the risk management process of the coal industry chain extension should be regarded as three phases, including portfolio risk management, program risk management and independent project risk management. The basic management mode was given. Considering the possible risk during the process of the coal industry chain extension, a series of countermeasures has been put forward for the precaution, identification, reduction and avoiding of strategy risks in the coal industrial chain extension.
出处 《西安科技大学学报》 CAS 北大核心 2011年第6期846-849,共4页 Journal of Xi’an University of Science and Technology
关键词 煤炭企业 产业链延伸 产业链风险 风险管理 灾害链式效应 coal enterprise industry chain extension industrial chain risk risk management chain effects of disaster
  • 相关文献

参考文献7

二级参考文献61

  • 1王虹,叶逊.生态工业园中企业的动力机制分析[J].环境保护,2005,33(7):72-75. 被引量:24
  • 2PMI.项目管理知识体系指南:3版[M].卢有杰,王勇,译.北京:电子工业出版社,2008.
  • 3PMI.项目组合管理标准[M].许江林,刘景梅,译.北京:电子工业出版社,2008:8-10.
  • 4PMI.项目集管理标准[M].杨侃,译.北京:电子工业出版社.2008:4-5.
  • 5Boehm B W. Software risk management: principles and practices [J]. IEEE Software,1991,8(1):32-41.
  • 6Fairley R. Risk management for software projects[ J]. IEEE Software, 1994,11(3) :57 -67.
  • 7Dorofee A J, Walker J A, Alberts C J, et al. Continuous risk management guidebook [ M ]. Pitts-burgh: Carnegie Mellon University, 1996 : 187 - 189.
  • 8Kliem R L, Ludin I S. Reducing project risk [ M ]. England: Gower, 1997:4 -6.
  • 9Chapman C, Ward S. Project risk management: processes, techniques and insights[ M ]. New York: Wiley, 1997:7 - 8.
  • 10Makarand H. ICRAM-1 : model for international construction risk assessment[J]. Journal of Management in Engineering, 2000, 16 (1) :59 -70.

共引文献38

同被引文献29

  • 1王金秀,闫泽滢.农村劳动力的根本性转移取决于农村教育[J].集美大学学报(教育科学版),2005,6(2):13-22. 被引量:1
  • 2林锡星.试析我国能源运输战略[J].东南亚研究,2005(2):46-50. 被引量:12
  • 3傅家良.运筹学方法与模型[M].上海:复旦大学出版社.2005.
  • 4阎磊.基于自组织理论的煤炭产业链演化机理研究[D].北京:中国矿业大学,2010.
  • 5刘碉,张怡曼,聂锐.基于DEA的产业链效率评价方法研究-煤炭产业链效率的实证分析:第九届全国青年管理科学与系统科学学术会议[C].广州:内部印刷,2007.
  • 6Yu,S. W. , Y. M. Wei. Prediction of China's coal production-environmental pollution based on a hybrid GA-SD model[J]. Energy Policy, 2012,42(3).
  • 7Daganzo F. Logistics systems analysis [ M ]. New York: Pringer-Verlay, 1996.
  • 8Wood F. International logistics [ M ]. Atlanta:Chapman Hall, 1995.
  • 9Design' simpacton logistics [ M ]. New York: McGraw- Hill, 1993.
  • 10胡运权.运筹学习题集[M].北京:清华大学出版社,2010.

引证文献3

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部