摘要
结合G3京台高速公路改建工程中的一座连续刚构上跨桥拆除工程,根据相关设计验算,分析制定了安全有效的拆除方案及施工顺序,为类似工程提供了一些经验。
Combining with the dismantlement practice of a continuous rigid frame overcrossing bridge on Beijing-Taipei Expressway(G3),according with relevant design and checking computations,the safe and effective dismantlement scheme and construction sequence are analyzed and established,which can provide some experience for similar engineering.
出处
《交通标准化》
2011年第22期163-168,共6页
Communications Standardization
关键词
改建工程
连续刚构
拆除方案
施工顺序
reconstructed project
continuous rigid frame bridge
dismantlement scheme
construction seq-uence