摘要 随着电力体制的改革发展,火电厂关停,水电站不断涌现,对电网要求越来越高,500千伏石棉变电站是川电东送的重要枢纽,也是国家和四川省的重点工程。此项工程所形成的档案材料多而新,为此,我局档案工作发扬努力超越,追求卓越、兢兢业业的精神,注重档案基础建设,狠抓重大项目档案管理,有效保证了档案归档的完备性、规范性和及时性。 With the development of the electricity system reform,shutting down power plants,hydropower stations have emerged,and the demand of electric fence becomes increasingly high. 500-kilovolt transformer substation is an important hub for sending power from Sichuan to the East,and is also the major project for the country and Sichuan Province. The archival materials formed by this project are so numerous and new that our bureau carries forward the spirit of striving to surpass, pursuing excellence and the spirit of dedication. Our bureau also pays close attention to file-oriented infrastructure and major projects file management so as to effectively guarantee the completeness,norm and timeliness of archiving files.
作者 兰英 张文欣
机构地区 西昌电业局
出处 《西昌学院学报(自然科学版)》 2008年第4期150-151,共2页 Journal of Xichang University(Natural Science Edition)
关键词 变电站 档案 管理 Substation File Management
  • 相关文献

参考文献1

共引文献1

同被引文献3

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部