Establishing time-dependent model of deformation modulus caused by bedrock excavation rebound by inverse analysis method 被引量:3

Establishing time-dependent model of deformation modulus caused by bedrock excavation rebound by inverse analysis method
原文传递
导出
摘要 Rock rebound relaxation deformation,or even rock burst,caused by the excavation of dam base and abutment or high rock slope affects their stability and results in the fall of mechanical properties of the rock.So an inverse analysis method was proposed in this paper to establish the time-dependent model of deformation modulus caused by excavation rebound.The basic principle is based on the combination of observed data of the excavation rebound deformation of dam abutment or rock slope,and the calculated rebound deformation by FEM under ground stress at the corresponding time in the excavation process.The norm of the residuals of observed data and calculated data are taken as the objective function.Accordingly,the time-dependent model of bedrock deformation modulus can be established.The method displays its significance in the design of excavation,construction and operation management of dam base and high slope. Rock rebound relaxation deformation,or even rock burst,caused by the excavation of dam base and abutment or high rock slope affects their stability and results in the fall of mechanical properties of the rock.So an inverse analysis method was proposed in this paper to establish the time-dependent model of deformation modulus caused by excavation rebound.The basic principle is based on the combination of observed data of the excavation rebound deformation of dam abutment or rock slope,and the calculated rebound deformation by FEM under ground stress at the corresponding time in the excavation process.The norm of the residuals of observed data and calculated data are taken as the objective function.Accordingly,the time-dependent model of bedrock deformation modulus can be established.The method displays its significance in the design of excavation,construction and operation management of dam base and high slope.
出处 《Science China(Technological Sciences)》 SCIE EI CAS 2008年第S2期1-7,共7页 中国科学(技术科学英文版)
基金 Supported by the National Natural Science Foundation of China (Grant Nos.50539110, 50809025,50539010,50579010,50539030) the National Science and Technology Supporting Plan (Grant Nos.20006BAC14B03,2008BAB29B06,2008BAB29B03)
关键词 DAM base REBOUND deformation MODULUS inverse analysis method TIME-DEPENDENT model Xiaowan HYDROPOWER Station dam base rebound,deformation modulus,inverse analysis method,time-dependent model,Xiaowan Hydropower Station