摘要
目前工程建设中对施工质量和施工进度的要求越来越高,为此,结合工程实例重点介绍了现浇混凝土结构中节头处不同混凝土浇筑方法的改进措施,解决了因不同强度等级的混凝土同一作业面浇筑而带来的人力、物力、财力的浪费。
At present engineering constructions,construction quality and construction progress are requested higher than before.Therefore,an improved method for nodes pouring in cast-in-situ concrete structures is proposed in emphasis combining with engineering examples.The problems of wasting of labors,materials and money due to different label concrete in the same pouring working side are solved in this paper.