大跨度钢屋架双塔机抬吊吊装施工技术 被引量:3

Hoisting Construction Technology with Double Tower Cranes of Large Span Steel Roof
下载PDF
导出
摘要 某垃圾坑屋盖为27m跨钢屋架,受四周环境条件限制,吊装机械无法站位,不能按传统施工方法采用大型吊装机械完成作业,根据现场现有条件,准备采用2台施工塔吊配合吊装作业;主要介绍了钢屋架在吊装过程中的难点及所采取的特殊技术措施、关键部件的内力计算并进行了相关经济效益分析。 The roof of garbage pit is 27 meters span steel structure.Because of environment condition limitation,hoisting machine has no method to erect,so traditional construction method by adopting large hoisting machine cannot complete the steel roof construction.Based on on-site conditions,two tower cranes are adopted to hoist the roof.In this article,the author shows the difficult points and special measures adopted during the hoisting,inner force calculation of key members and corresponding economic benefit analysis.
作者 田军果
出处 《施工技术》 CAS 北大核心 2008年第S1期306-308,共3页 Construction Technology
关键词 钢屋架 双塔吊 抬吊技术 方案 steel roof double tower cranes hoisting technology scheme
  • 相关文献

同被引文献7

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部