摘要
讨论研究了扬州二电有限公司干煤棚网壳的施工方案的确定,施工脚手架的设计及结构脚手架的安装,确定工程施工工艺。确定施工方案时,选择了与实际工程相仿的网壳结构脚手架,通过计算节点形式、结构形式有了很大的改变,有效地降低了成本,并缩短工期。
Authors discuss construction plan of reticulated shell on dry coal shed,scaffold design and installation,and determine construction technology.When determine the construction technology,authors select scaffold of reticulated shell structure used in similar project.By calculation,joints style and structure form have large change,which lower effectively cost and shorten period.
出处
《施工技术》
CAS
北大核心
2008年第S2期384-386,共3页
Construction Technology
关键词
干煤棚工程
脚手架
网壳结构
dry coal shed project
scaffold
reticulated shell structure