期刊文献+

广州珠江黄埔大桥嵌岩地下连续墙施工工艺研究 被引量:2

Construction technology of rock-socketed diaphragm walls of Huangpu Bridge over Zhujiang River in Guangzhou
下载PDF
导出
摘要 随着我国大跨桥梁建设的发展,桥梁锚碇基础的地下连续墙施工技术要求日益突出。结合广州珠江黄埔大桥南、北锚碇的嵌岩地下连续墙施工,针对不同的工程地质条件,着重介绍了槽段划分、导墙和施工平台、泥浆系统、成槽工艺等关键施工工艺。经实践证明,采用这些施工工艺,取得了很好的经济效益和社会效益。 With the development of the large-span bridges in China,more technologies for the diaphragm walls of the bridge anchorages have been demanded.According to different geological conditions,the construction technologies of south and north anchorages of Huangpu Bridge over Zhujiang River in Guangzhou were given,including the trough-dividing,guide walls, construction platforms,mud system and trenching technology.The construction technology led to satisfactory economic and of the social benefits.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2008年第S1期549-553,共5页 Chinese Journal of Geotechnical Engineering
基金 2006年度广东省交通厅行业重点攻关科研项目(粤交科[2006]708号)
关键词 地下连续墙 施工工艺 成槽 diaphragm wall construction technology trough-making
  • 相关文献

参考文献2

二级参考文献7

共引文献22

同被引文献10

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部