摘要 首先介绍了采用一种新施工方法的武汉三金潭污水处理厂卵形消化池混凝土五阶段浇筑方案,然后详细进行了施工过程模拟分析,包括分析模型、荷载工况、结构响应,以及模板框架支撑系统设计等。 A five-phase scheme of concrete-cast-in-site with a new developed construction procedure is firstly introduced for the egg-shaped digester tank tower in wuhan sanjintan sewage treatment plant.The simulation analysis is performed with respect to each phase,include the analytical model,loading condition,structural response and the design of formwork system,etc. The present works are valuable to the similar projects in the future.
出处 《施工技术》 CAS 北大核心 2006年第S2期117-120,共4页 Construction Technology
关键词 卵形消化池 施工模拟分析 模板框架系统 egg-shaped digester tank construction simulation analysis formwork system
  • 相关文献

同被引文献4

  • 1GB50204-2002,混凝土结构工程施工质量验收规范[S].北京:中国建筑工业出版社,2002.
  • 2GBJ141-90,给水排水构筑物施工及验收规范[S].北京:中国建筑工业出版社,1990.
  • 3建筑施工手册编写委员会建筑施工手册(第四版)[M].北京:中国建筑工业出版社,2003.
  • 4刘雪平,陈务军,张丽梅,陈军.武汉三金潭卵形消化池新施工方法[J].施工技术,2006,35(S2):113-116. 被引量:2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部