摘要
首先介绍了采用一种新施工方法的武汉三金潭污水处理厂卵形消化池混凝土五阶段浇筑方案,然后详细进行了施工过程模拟分析,包括分析模型、荷载工况、结构响应,以及模板框架支撑系统设计等。
A five-phase scheme of concrete-cast-in-site with a new developed construction procedure is firstly introduced for the egg-shaped digester tank tower in wuhan sanjintan sewage treatment plant.The simulation analysis is performed with respect to each phase,include the analytical model,loading condition,structural response and the design of formwork system,etc. The present works are valuable to the similar projects in the future.
出处
《施工技术》
CAS
北大核心
2006年第S2期117-120,共4页
Construction Technology
关键词
卵形消化池
施工模拟分析
模板框架系统
egg-shaped digester tank
construction simulation analysis
formwork system