摘要
介绍了天津一工程中大截面大跨度转换梁的模板支架的搭设方案,对模板受力进行了分析,并对模板的搭设方法和施工安全技术措施进行了介绍。
In this article,authors introduce the layout method of form formwork used in Tianjin a project transfer beam with large section and large span.The behavior of formwork under load is analyzed.The construction method of formwork layout and construction safety measures is introduced in detail.