A Cooperation-planning Model Based on Bilevel Programming Decision 被引量:1

A Cooperation-planning Model Based on Bilevel Programming Decision
下载PDF
导出
摘要 This paper is based on a resource constrained active network project;the constraint of the local resource and the time constraint of the cooperation resource are considered simultaneously.And the respective benefit of the manager and cooperation partners is also considered simultaneously.And a cooperation planning model based on bilevel multi-objective programming is de- signed,according to the due time and total cost.And an extended CNP based on the permitted range for resource and time requests is presented.A larger task set in scheduling cycle is on the permitting for the request of cooperation resource and time while the task manager itself may be permitted biding for tasks.As a result,the optimization space for the cooperation planning is enlarged.So not every bidding task is successfully bid by invitee,and the task manager itself takes on some bidding tasks.Finally,the genetic algorithm is given and the validity and feasibility of the model is proved by a case. This paper is based on a resource constrained active network project;the constraint of the local resource and the time constraint of the cooperation resource are considered simultaneously.And the respective benefit of the manager and cooperation partners is also considered simultaneously.And a cooperation planning model based on bilevel multi-objective programming is de- signed,according to the due time and total cost.And an extended CNP based on the permitted range for resource and time requests is presented.A larger task set in scheduling cycle is on the permitting for the request of cooperation resource and time while the task manager itself may be permitted biding for tasks.As a result,the optimization space for the cooperation planning is enlarged.So not every bidding task is successfully bid by invitee,and the task manager itself takes on some bidding tasks.Finally,the genetic algorithm is given and the validity and feasibility of the model is proved by a case.
出处 《武汉理工大学学报》 CAS CSCD 北大核心 2006年第S3期940-945,共6页 Journal of Wuhan University of Technology
关键词 bilevel PROGRAMMING DECISION COOPERATION planning GENETIC algorithm RANGE for RESOURCE and time sequest bilevel programming decision cooperation planning genetic algorithm range for resource and time sequest
  • 相关文献

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部