期刊文献+

A Method of Job Scheduling on SMEs' Key Equipments Based on Hybrid Multi-attribute Decision Making 被引量:2

A Method of Job Scheduling on SMEs' Key Equipments Based on Hybrid Multi-attribute Decision Making
下载PDF
导出
摘要 An analysis of the key factors affecting on the single production process job scheduling of the parts waiting for be- ing processed on the key equipments for SMEs (Small Manufacturing Enterprises) is given in this paper,which include interval number,real number and uncertain linguistic value.A kind of hybrid multi-attribute decision making method for the single pro- duction process job scheduling is presented in this paper,that the parts are firstly sorted about each factor,and then the total evalu- ative attributive value of each part is calculated with the method of weighted arithmetic average,and thus the part with the highest total evaluative attributive value is chosen for being processed firstly.The mathematic model corresponding to the method is set up in this paper.An example is studied in this paper,and the results of the example testify the correctness of this model. An analysis of the key factors affecting on the single production process job scheduling of the parts waiting for be- ing processed on the key equipments for SMEs (Small Manufacturing Enterprises) is given in this paper,which include interval number,real number and uncertain linguistic value.A kind of hybrid multi-attribute decision making method for the single pro- duction process job scheduling is presented in this paper,that the parts are firstly sorted about each factor,and then the total evalu- ative attributive value of each part is calculated with the method of weighted arithmetic average,and thus the part with the highest total evaluative attributive value is chosen for being processed firstly.The mathematic model corresponding to the method is set up in this paper.An example is studied in this paper,and the results of the example testify the correctness of this model.
出处 《武汉理工大学学报》 CAS CSCD 北大核心 2006年第S2期694-699,共6页 Journal of Wuhan University of Technology
基金 Supported by the key project of science and technology plan in the Guangxi Zhuang Autonomous Region China(0630005-8)
关键词 JOB scheduling MULTI-ATTRIBUTE DECISION making INTERVAL number UNCERTAIN language job scheduling multi-attribute decision making interval number uncertain language
  • 相关文献

同被引文献13

引证文献2

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部