摘要
本文介绍了近年来改进的Osterberg试桩法-预埋载荷箱桩基静载荷法的基本原理和特点,以及在合肥地区桩基静载荷试验中的应用及其取得的成果,充分说明该方法对于合肥及软岩地区的嵌岩桩的试验和性状研究是特别适宜的。
The pre-burring load cell static pile load test -a modified Osterber's cell pile load test method is introduced on its general principle, features, development and application recent years. Many results show that the new method is very fit for static load test of capability of pile with soft rock socket around Hefei City or the similar areas.
出处
《工程勘察》
CSCD
北大核心
2006年第S1期245-248,共4页
Geotechnical Investigation & Surveying