摘要
介绍了北京城市铁路14标段区间隧道采用旋喷桩墙和二重管无收缩浆液WSS工法注浆施工技术,保证了建(构)筑物的安全,保证了工期。
In this article,authors introduce construction technology of spiral spray pile and double pipe non-shrinkage mortar WSS adopted in 14 segment tunnel of Beijing urban railway,which can assure the safety of building and construction period.
出处
《施工技术》
CAS
北大核心
2005年第S1期302-304,258,共4页
Construction Technology
关键词
地铁工程
旋喷桩
收缩
railway engineering
spiral spray pile
shrinkage