摘要
香港中环填海三期的直立波浪吸收型海堤和冷水泵房工程,采用场外预制、气囊搬运、浮运及沉放安装的沉箱施工技术。本文介绍海事工程中的大型沉箱施工的关键技术。
The technique in large caisson construction is adopted in the vertical wave absorbing seawall and cooling water pumping stations of the Central Reclamation Phase 3 Project in Hong Kong.The key technique in large caisson construction of marine works is introducing precast concrete works off site,rolling method,floating and installation in this paper.
出处
《施工技术》
CAS
北大核心
2005年第S1期321-322,283,共3页
Construction Technology
关键词
海事工程
预制沉箱
浮运
沉放安装
marine works
precast concrete caisson
rolling method
floating and installation